32x Vestas V66 - 78m Towers - 66m Rotor For Sale
1.65mW and 1.75mW – AVAILABLE Q4 - 2015/Q1 - 2016 - Apply Now!


Bangladesh Power Development Board(BPDB) Announces 100-200 MW Project

[ad]

Invitation for participation of 100-200 MW offshore grid connected wind power project On a Build Own Operate (BOO) basis

Bangladesh Power Development Board(BPDB) has taken initiative to install 100-200 MW offshore grid connected wind power project On a Build Own Operate (BOO) basis along the coastline of Chittagong, Bangladesh. Notice and Pre-Qualification Documents are available at the BPDB’s website :  http://www.bpdb.gov.bd/bangladesh

[ad]

Make Sure To Sign Up To Our Mailing List!

Top Wind Power People Read The MWPS Newsletter!

One Response to Bangladesh Power Development Board(BPDB) Announces 100-200 MW Project

  1. md.arifuzzaman June 7, 2011 at 1:27 pm #

    i m the student of Daffodil international university department of ETE.
    i need some information about windmill that how to make electricity by using windmill for my project / thesis purpose.

Leave a Reply

Powered by WordPress. Designed by WooThemes

SEO Powered by Platinum SEO from Techblissonline