FEATURED BRANDS: Vestas| Enercon| Nordex| GE General Electric| Fuhrländer| Bonus

DeutchРусскийEnglishEnglish

Welcome, visitor! [ Register | Loginrss  |  tw


For urgent enquiries, please call +44 7962 42 0898

 

$1,000,000

GE 2.5mW Wind Turbines – GE 2.5S Wind Turbines For Sale – 10 x Brand New Available Immediately

  • Location: Japan
  • Phone: +44 (0) 7962 420898
  • URL: http:www.mywindpowersystem.com
  • Listed: 24/01/2012 7:50 pm
  • Expires: 637 days, 18 hours
GE 2.5mW Wind Turbines – GE 2.5S Wind Turbines For Sale – 10 x Brand New Available Immediately

Description

Relisted – Only 10 Units left!

10 discounted units of brand new General Electric GE Wind Turbines – GE 2.5S – 2.5mW Wind Turbines For Sale!

All units are excluding Towers

GE 2_5MW Wind Turbine

Picture for illustration only

Great opportunity for the serious wind energy investor or Wind Farm developer who is looking for immediately available large industrial 2.5MW wind turbines.

10 units left of these brand new wind turbines of the magnificent GENERAL ELECTRIC GE 2.5MW immediately available

Build in 2008, these IEC Class IIa Wind Turbines had been shipped to Asia in 2008 and are currently in storage at the original destination port in Asia. All 10 left over units are still readily packaged and can be shipped world wide immediately. The turbines have never been in operation and all 10 units come without towers  -  Incoterm FOB – Japan Seaport – Please note that warranty has expired during storage and would need to be purchased seperatley from GE. Multiple different warranty packages available. Please see GE energy website.

As a reference, we had previous quotes for extended warranty for approx. 100 Euros per day per machine.

    • Tower specs and drawings available to obtain quotes from 3rd party tower manufacturers


GE 2_5MW Wind Turbine large

Picture for illustration only

POWER
Rated power 2,500 kW
Rated wind speed 12.0 m/s
Cut-in wind speed 3.5 m/s
Cut-out wind speed 25.0 m/s
ROTOR
Diameter 88 m
Number of blades 3
Rotor speed 14.1 rpm (rated power) rpm
Type LM 487
Material glas-fibre reinforced plastic

NACELLE
Design separated
GEAR BOX
Type combined spur / planetary gear
Stages 3
Ratio 1:117.4

GENERATOR
Type synchronous, permanent magnet
Number 1
Speed 1,650 rpm (rated speed) rpm
Voltage 690 V V
Grid connection via converter
Grid frequency  60 Hz

Please Note: Currently these turbines are set to operate on 60hz  grid frequency and need to be converted to 50hz  for countries operating on 50hz grid at buyers expense! These are IEC Class IIa turbines with 88m Rotor Diameter

DCONTROL AND PROTECTION SYSTEM
Power limitation pitch
Speed control variable via microprocessor
Main brake individual blade pitch control
Second brake system disk brake
Yaw control system 4 electric gear motor(s)

Note: Above technical data is subject to technical alterations, errors and omissions

GE 2_5 Wind Turbines packaged 1GE 2_5 Wind Turbines packaged 2GE 2_5 Wind Turbines packaged 3

GE 2_5mW wind turbine Blades in storage

GE 2_5mW wind turbine Blades in storage

GE 2_5mw wind turbine hub in storage

GE 2_5mw wind turbine hub in storage

GE 2_5mw wind turbine Nacelles in storage

GE 2_5mw wind turbine Nacelles in storage

Contact Ad owner for quick sale

Viewings can only be arranged if signed LOI (Letter of Intend) has been received.

NOTES:

    • The items listed in this advert are offered for sale by a private owner or wind farm operator through MWPS.
    • Neither MWPS nor the owner of these turbines provide shipping or transportation services
    • Unless a shipping service/offer is specifically listed in this advert, collection and transportation/shipping must be organized and paid for by the buyer.
    • However, both MWPS or the owner will endeavor to assist you in the best way to organize the Loading, and transportation or you can get fast, free & competitive shipping quotes from world wide shipping companies specialized in international wind turbine transports using the service provided by uShip. See below!

  • Viewings only if signed LOI (Letter of Intent) has been received.
  • Time wasters and tire kickers will not be accommodated!

MWPS logo new large tif STRECHED 185PX

NEED A SHIPPING QUOTE FOR THESE TURBINES?

Get fast, free & competitive shipping quotes from world wide shipping companies specialized in international wind turbine transports.


uShip horizontal_Banner1_Furniture

Get a shipping quote from uShip! For collection address reference, use the town of  Leeds, UK.  Click here to get quotes!

HOW DOES uSHIP WORK?

Disclaimers: Above technical data is subject to technical alterations, errors and omissions

1. Wind turbine installation is highly customized according to location, set-up, seismic conditions, soil, zoning, local restrictions, and many other factors 2. Taxes, Containerizing and Shipping is not included. Estimates do not include export and other international fees.

3. This information should be used for general budgetary reasons only.

4. Pricing and availability is subject to change at any time without notice

5. The displayed location in the ‘Google Maps’ section of this advert only indicates the approximate location of the equipment

6. Please refer to our full terms & conditions. Click here!


VN:F [1.9.11_1134]
Rating: 10.0/10 (2 votes cast)
VN:F [1.9.11_1134]
Rating: +1 (from 1 vote)
GE 2.5mW Wind Turbines - GE 2.5S Wind Turbines For Sale - 10 x Brand New Available Immediately, 10.0 out of 10 based on 2 ratings
Ad Reference ID: 9874ed3d1f811cb0

 

17,615 total views, 15 today

  

45 Responses to “GE 2.5mW Wind Turbines – GE 2.5S Wind Turbines For Sale – 10 x Brand New Available Immediately”

  1. chrispin gomani on 09/08/2011 @ 5:26 pm

    can please give the price for it to arrive here in Malawi.

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  2. ade emman on 15/06/2011 @ 12:27 am

    PLS TELL ME THE PRICE OF THIS 2.5MW WIND TURBINE, THE COST OF THE POLE, SHIPPING TO LAGOS NIGERIA.
    I WISH TO KNOW IF IT REQUIRES BATTERIES

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  3. Please let me know best price as I am in a position to buy immediately for an Ontario Canada project

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  4. Shamil Ayntrazi on 14/05/2011 @ 1:02 pm

    Once an offshore wind farm is planned for construction then it is worth to utilization of the offshore area to extract maximum energy. This is achieved by installing reversible Ebb/Tide turbines and a wave energy extraction system.
    Three systems of “Wave Gear Drive System-WGD” are proposed for Wave Energy Extraction and Power Leveling through the whole cycle. It consists of a buoyant float developing an uplift of 2.65 tons, using pulleys and reduction gear to directly drive pumps or generators:

    Wave Gear Drive System-WGD
    The WGD complements onshore/offshore wind turbine systems.
    a. By utilizing the offshore space and structure by adding other systems to extract additional energy,
    I. Wave Gear Drive system.
    II. Ebb/Tide reversible hydro turbo generators
    b. Onshore Wind Turbine systems can be modified to transmit wind turbine power down to ground level to drive an air compressor, collect compressed air and feed it to the air inlet of a turbo generator and feed fuel as needed to maintain required power. This would result in the following advantages:
    I. Reduce the weight of the equipment currently installed at the top of the supporting column.
    II. Simplify blade pitch control that is needed to maintain frequency in spite of varying wind speed and turbine rotation.
    III. Reduce the number of electric generators, as only one turbo generator would be required.
    IV. Have better and dependable frequency control with varying wind speed and power output.
    V. Power is transmitted from the top of the supporting column at reduced RPM, that is; same RPM as the wind turbine. Reduction gear would raise the RPM for operating the air compressor.
    VI. The reduced efficiency of the system would be offset by reduced operation and maintenance and reduced capital cost.
    c. The WGD system provides wave power leveling to provide constant power through the whole cycle of the wave of 360 degrees. This is achieved by means of local energy storage above the “Construction Unit”, capacitors and/or high inertia fly wheels.
    d. The WGD system consists of a buoyant float on the sea surface moving up and down with the wave motion developing an uplift force of 2,650.7 Kilograms. This uplift force is transferred through a set of pulleys and reduction gear to pumps or generators to generate electric power which is conditioned, synchronized and transmitted to the shore ready for connection to electric network. The equipment used is the following:
    1. Wave Air Pump-WAP: Compresses a small quantity of air to a high pressure; collects and feeds it to the air inlet of a turbo generator. Fuel is injected as needed to maintain required turbo generator output at reduced fuel consumption irrespective of availability of waves. Adding a “fogging system” (injecting water vapor into the turbine inlet air) will further improve the efficiency of the turbo generator as detailed at: website: http://www.meefog.com/downloads/GT_Comp_Guide.pdf and http://www.espcinc.com
    2. Wave Gear Drive Pump-WGDP: The float directly drives a water pump through a set of pulleys and reduction gear to pump a small quantity of water to a high head; collect and feed it to a hydro-turbo generator to generate electric power. The wave water pump can be either:
    I. A WWP, reciprocating wave water pump..
    II. A WWP rotary wave water pump
    3. Wave Gear Drive Generator-WGDG: The float directly drives a Generator through a set of pulleys and reduction gear, to directly generate electric power. The generator can be:
    I. A synchronous AC Generator where Alternating voltage is conditioned; synchronized and feed to a step up transformer for transmission through a cable to the shore.
    II. A DC Generator where Direct Current voltage is conditioned, converted to AC voltage, synchronized and feed to a step up transformer for transmission through a cable to the shore.
    III. Use Direct Current to generate Hydrogen, transmit to shore and use as clean fuel to generate electric power.
    i. Many of the planned offshore wind farms will have a large power and a considerable cable length to a receiving grid. The use of AC cables will be limited by the physical nature of the cables. The cable can be regarded as a distributed capacitor which in AC will need constant recharging and at a given length, the critical length; this recharging current will be equal to the rated current for the cable. As a result there will not be any power transmission. Courtesy Erik Koldby#1, Mats Hyttinen*2,

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  5. we at the onondaga nation are very intressted in going off grid in complience with our green effort we have already compleated a wind energy feasibilty study over the corse of a year and now are in the process of finding a mill to adress our needs i need a price for the 2.5 meg wind turbine including shipping fees

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  6. PLEASE SEND ME THE BEST PRICES FOR GE 2.5MW TURBINES

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  7. walid boukhmmis on 21/03/2011 @ 6:12 pm

    hello can you send me some publication

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  8. asif islam on 17/02/2011 @ 9:30 pm

    We need WIND TURBINE (3- BLADES), made in U.S.A OR European

    Please provide me with the price/warrant/ time for supply
    The capacity is as follows:-
    - 1.5 MW ( each) 3 nos= 4.5 Mw.
    or

    2 mw (each capacity) 2 nos=4 MW
    AND
    1 MW/ 0.5 MW( Each ) 1 nos.=1MW

    Wind speed is 4m/s to 5 m/s.
    Minimum alaible wind speed=150 mph.

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  9. Sorry I meant to get quote for 32 not 30.
    Richard

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  10. Richard Stone on 09/09/2010 @ 7:24 pm

    We would like to have a quote to buy all 30 GE Turbines that will go to West AFrica and funding is in place and would like to start project within 90-days. American Engineering Firm IAE will be our builder.
    Sincerely,
    Richard Stone
    CEO

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  11. J Qaddour on 26/08/2010 @ 5:55 pm

    Can you Please advise if the GE units are still available. If they are, please send the best price offer for individual and all of them and sale terms. As well, please advise listing of additional equipment needed and any third-party,as well as any other details/specifications of the equipment, as well the shipment and installation.

    Have interest in purchasing.

    best Regards,

    WIND &SUNERGY Inc
    USA

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  12. Can u please send me a quote and specifications for 1kilowatt hawt wind turbine.thank u.

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  13. Wind Power Project in the Golan Heights
    Call for Proposals

    In recent years, the state of Israel has decided to gradually move towards the production and consumption of green energy, namely solar and wind energy.
    In this line, the Government recently issued a very important decision to grant private individuals the opportunity to participate in the production of some 30 MW to be sold directly to the Electricity Company of the country. This company is therefore bound, in virtue of the aforementioned Government decision, to commit to buy wind generated power from individuals for a period of 20 years, in accordance with the following scales:
    1. Up to 15 KW, for a price of 1.68 NIS (this is, some 0.35 Euro) per KW.
    2. From 15 to 50 KW, for a price of 1.31 NIS (this is, some 0.27 Euro) per KW.
    Within this context, the territory of the Golan Heights stands as the best possible location in the country, due to its geographical conditions. In fact, the territory, situated to the far north of the country, has a height of between 900 and 1400 meters above sea level. This is why this territory is regarded as the first priority for the placement of wind power turbines to produce as much as possible of the initially planned for 30 MW.
    According to governmental bodies measurements of wind speed in some areas of the Golan Heights (above 900 meters on average), the average wind speed throughout the year is 8.3 meters per second. However, further to the northern part of the territory, where our project would be implemented (up to 1400 meters above sea level), our measurements of wind speed show the following results for the last three years:
    Year Average wind speed
    2007 12 m/s
    2008 12 m/s
    2009 12 m/s
    These conditions are true all year round, especially from autumn through spring (this is 9 months), but also during summer season with slightly lower records. Therefore, the area becomes the most adequate location to ensure the economic success of our project.
    Green Golan is a young company established by a group of local professionals from varying backgrounds that intends to develop and implement a major wind power project in the northern part of the Golan Heights. In this part of the territory, the company is planning to cooperate with local land owners, in an area that extends over about 2 million square meters. The projected land is generally used for agricultural purposes by locals, and its ownership is widely split amongst small owners (some 2 to 5 thousand square meters for each owner).
    It is important to highlight that electricity supply lines are already available in and around the projected areas where wind power turbines would be installed. This will highly facilitate the direct connection of individual turbines to the electricity company. In addition, our company already has topographical plans for the entire area. All potential locations are easily accessible, as they are already being used by the farmers to produce various fruits, especially apples and cherries.
    While we continue to look into potential donor funding for this initiative, several local banks have expressed their willingness and readiness to contribute to the funding of our project. However, our company is open to discuss any additional proposals in this regard.
    Based on the above, it is possible to conclude that our company intends to implement a wind power project that consists of the installation of small wind power turbines, in cooperation with individual land owners, to produce between 15 and 50 KW in each case, with a total projected production of up to 10 MW. Generated power will then be directly sold to the national Electricity Company, who commits to buy all generated power for an initial period of 20 years.
    Therefore, we would like to invite proposals for the supply of the following sizes of turbines:
    1. 5 KW (a total of some 2000 turbines for the production of 10 MW)
    2. 7.5 KW (a total of some 1333 turbines for the production of 10 MW)
    3. 15 KW (a total of some 667 turbines for the production of 10 MW)
    4. 50 KW (a total of some 200 turbines for the production of 10 MW)
    Prices should be expressed to include transport to our location and installation fees, in addition to maintenance (although we would also be open to discuss the possibilities of training local teams to implement maintenance services in the future). Proposals should also include details of guarantees for the equipment, and any other relevant conditions. Proposals may also be made for the establishment of wind power plants, as all projected locations are close to each other and are within a relatively small area.

    We welcome your proposals and comments, and would be happy to respond to any queries that you may have in this regard. It would especially be interesting for us to hear from you about your readiness to provide pilot or sample equipment that could be tested in situ.

    Thank you in advance for your interest and contribution. You may contact us at all times on the contact details as shown below.

    Sincerely

    Green Golan Co.
    Golan Heights

    green.golan@hotmail.com
    ayman@mundivia.es

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  14. KARMAK LTD MR. KARAR on 23/07/2010 @ 11:40 am

    SEHR GEEHRTER HERREN.
    WİR HABEN 72MW PROJEKT VON STADT BEKOMMEN
    WİR İNTRESSİREN FÜR 32 STÜCK 2,5 MW KOMPLETE ANLAGEN.
    WİR BİTTEN UM DİE ANGEBOT MİT DATEN
    MFG.
    KARAR

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  15. ARE YOU SELLING THEM INDIVUALY ? ARE THEY COMPLETE AND BRAND NEW? DO U SHIP AND INSTALL? IS THERE FIANCING AVAILABLE IF SO CAN SHIPPING AND INSTALL BE INCLUDED? HOW MUCH EACH? THANK YOU

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  16. Have POF need FOB price immediately.

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  17. Tossaporn on 16/07/2010 @ 3:38 am

    We are working with wind farm project in Thailand.
    In case we need 36 units of GE 2.5 MW. Please advise offer and sale terms. As well, please advise listing of equipment and any third-party, independent survey of the equipment, as well as any other details/specifications of the equipment.

    Have interest in purchasing.

    Thank you.

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  18. Adv Anil chavan on 19/06/2010 @ 12:36 pm

    i am Director of co. we r having 120A of land in India. we want to go for JOINT VENTURE PROJECT OF WINDMILL.pls. let me know which company’s go for JOINT VENTURE PROJECT

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  19. stephen jokelson on 16/06/2010 @ 5:49 pm

    Below are details of our requirement for the Middle east. Can you advise what you supply to fulfill this order together with an indicative price.
    Thank you
    Stephen Jokelson

    We are pleased for quotation and supply of Wind Turbine, as following specifications :

    Type A Horizontal Axis Wind Turbine

    Range of request power portfolio 2.3 MW

    Wind speed 8 m/s

    Hub 30 m.

    Quantity 50 Set

    Type B Horizontal Axis Wind Turbine

    Range of request power portfolio 1.5 – 2.0 MW

    Wind speed 8 m/s

    Hub 60 m.

    Quantity 50 Set

    Quotatation to be on CIF delivery basis

    Delivery time as soon as possible

    Payment to be made by Spain Prime Bank

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  20. GILBERTO on 15/05/2010 @ 4:21 am

    We have 1.300 ha in northeast of Brazil and looking partner/investor with our project. In the area, if will install the GE 2.5 XL, has a capacity factor before losses of 39.8. If we install the V-100 1.8 MW de gross capacity factor will be 52.5.

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  21. hailay atsebeha on 15/05/2010 @ 12:07 am

    hello my name is hailay i am from ethiopia i am looking the bigst wind company that can bulld up to 50 to 100 mw please contact me with your phone

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  22. Hello, tell me please price for 4 complete GE 2.5MW wind turbine system with delivery in Latvia.
    Thank you

    VA:F [1.9.11_1134]
    Rating: 5.0/5 (1 vote cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  23. Cleartech on 11/05/2010 @ 1:42 pm

    Can you forward me a price for 10 no x GE 2.5MW.

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  24. Pat Whelan on 07/05/2010 @ 9:08 pm

    What is your asking price for the 14 GE 2.5 Mw units with blades…very interested

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  25. Z Dawood on 07/05/2010 @ 12:19 am

    Hi,
    Can you please send me a quote for 1 x 2.5MW Wind Turbine, without towers and without blades.

    Kind Regards
    Z Dawood

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  26. Please provide me with a quote for one complete GE 2.5MW wind turbine system. I am in America.
    Thanks~

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  27. can you send me a qoute plz. im based in india & bangladesh.

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  28. Dear sir,
    you are kindle requested to inform us total cost of these wind turbines?
    And because of these turbine are secend hand the GE accepted to warranty these packages.
    best regards
    nima

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  29. Can I have a qute please for the 30 Turbines?

    Also can they be sold seperately?

    VN:F [1.9.11_1134]
    Rating: 5.0/5 (1 vote cast)
    VN:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  30. Sir,
    would like to request a quote on your 2.5 megga watt turbine.
    also would like to request forudation spec.s
    as this will effect final coast.

    Thanking you in advance
    Todd B. Buras
    mpro resources, inc.

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  31. Please, reply me with your best price. We are interested in at least 10 units for installation in a new windmill farm project in Africa. Advise me on the extent of your technical support available, if any. Thanks

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  32. hello dear
    we want to buy a complete 2.5mw wind turbine on-grid system.
    pleas send for us full needed informatione and details .
    we are waiting your answer .
    maybe we want to buy the generator(only) from other company, is it possible?
    thank you

    DOR-ALBORZ Co.
    tel & fax : 098 282 2224116
    Email : kooleposhti65@yahoo.com

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  33. and by the way, people do trust Siemens and not GE. GE was the opponent of AC Power at the beginning. The guys are always way behind as usual…

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  34. ny limo service on 05/02/2010 @ 12:06 pm

    Hi,
    I appreciate your blog,and provide more information on this?
    Regards,
    Jane

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  35. Hi
    could you please, provid me with the power curve of the GE 2.5 xle wind turbine . Is there any guarrantee from the manufacturer for these wind turbines? . Can the manufacturer make the towers of these wind tubines and supervise the instullation and commissioning ? . How much will be the total cost of these wind turbines? .

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  36. Taylor Swift Concert Tickets on 20/01/2010 @ 6:42 am

    Hi,
    I really liked your blog!
    Regards,
    Jane

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  37. Taylor Swift Tickets on 19/01/2010 @ 11:15 am

    Hi,

    Thanks for This Great Post,I found this post from my Upcomming Newsfeed Section. Very usefull post all of us. Keep it up.

    Jennifer

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  38. Cheap Mobile Phones on 15/01/2010 @ 7:38 am

    Hi,
    I found your blog on google and read a few of your other posts. I just added you to my Google News Reader. Keep up the good work. Look forward to reading more from you in the future.
    Regards,
    Jane

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  39. Dear Ralph,

    Please advise if the 30 GE units are still available. If they are, please advise offer and sale terms. As well, please advise listing of equipment and any third-party, independent survey of the equipment, as well as any other details/specifications of the equipment.

    Have interest in purchasing.

    Thank you.

    Randall

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  40. dear ralph

    i am looking 2.5-5MW wind turbines i have got the land and permission from the authority. i want start my own electricity company.
    will be help full for me if you could kindly give me written quotation including shipment and installations in east african ports.
    also looking partner/investor with this project which brings very high return.
    mak mursal
    london uk

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  41. Hello,
    How much cost these Wind turbines?
    And, how are these capasitet annual and power?

    regards,
    bostjan

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  42. Hi Kari,

    I will send you a personalised quote through our mail account.

    Thanks

    Ralph

    VN:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VN:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  43. Kari Kurki on 09/12/2009 @ 8:03 pm

    Hello.

    How much cost these V 90 do you have selling?
    And, how are these capasitet annual and power?

    Kind regards

    Kari Kurki
    Finland

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  44. THANK YOU FOR YOUR ANSWER

    CAN YOU GIVE ME THE PRICE FOR THE VESTAS V90
    DO YOU MAKE THE VESTAS?

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)
  45. i am in france

    can you give me the price arrive in france

    VA:F [1.9.11_1134]
    Rating: 0.0/5 (0 votes cast)
    VA:F [1.9.11_1134]
    Rating: 0 (from 0 votes)

Leave a Reply

You must be logged in to post a comment.

To inquire about this ad listing, complete the form below to send a message to the ad poster.

Feature

Rare Opportunity – NedWind 500kW

JOIN OUR SITE